Structure of Software plan :
a- comonent testing:
We Will Test individual program component in isolation
b- system testing:
1-test if PSS resolve the conflect by enter conflect schedules or non conflect schedules.
2 test if staff or student enter valid or invalid date & time.
3-test if admin enter correct and incorrect log in .
4-test if staff or student enter the date out of range or between range.
5-test if the search time is fast or slow if alot of person access to PSS.
6-test the sequred whith use by enter alot number of password.
| Test process Description Duration in(Day) Responsibility of |
|
Component testing Test individual program component 15 Developers
|
|
Integration testing Access to the system source code 7 test team
The system is tested as components
Are integrated
|
|
Release testing Test the complete system to be delivered as 4 test team
black-box
|
- All staff & student should put there schedules in coordinator office .
- determent specific person for the testing
- determent specific time for the testing
- should have a checklist ready .
ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ
Comments (2)
wajd said
at 2:00 am on May 18, 2008
بنات معليش كل شغلكم تحطونه بصفحة
test
لانه جداول و صعب نسويلها
copy
احنا الحين تقريبا باقيلنا كم خطوة من
test plan
بصفحة test
و مشكورين :)
wajd said
at 4:12 am on May 23, 2008
im sorry girls i removed ur names and comment but i couldn't copy and paste and there wasn't much time
plz all leave ur names ..
sorry again ..
You don't have permission to comment on this page.