Structure of a SW Test Plan(new)

Page history last edited by wajd 1 yr ago

 

                                                               Testing                                                                         

 

 Structure of Software plan :

 

  • The testing process.
 
        a- comonent testing:
               
           We Will Test individual program component in isolation
 
        b- system testing:
 
  • integration testing  : bottom up
  • release testing : Black -box testing               
 
  • Requirements traceability.
             
              1-test if PSS resolve the conflect by enter conflect schedules or non conflect schedules.
              2 test if staff or student enter valid or invalid date & time.
              3-test if admin enter correct and incorrect log in .
              4-test if staff or student enter the date out of range or between range.
              5-test if the search time is fast or slow if alot of person access to PSS.
              6-test the sequred whith use by enter alot number of password.
 
  • Testing schedule...
     
Test process                         Description                                                  Duration in(Day)                   Responsibility of  

Component testing               Test individual program component                         15                                   Developers 

Integration testing                Access to the system source code                          7                                     test team

                                           The system is tested as components

                                          Are integrated

 

Release testing                     Test the complete system to be delivered as            4                                    test team

                                            black-box

     
  • Hardware and software requirements :
     
    a program to simulate concurrent users to measure response time .
 
 
  • Constraints:

 

  • All staff & student should put there schedules in coordinator office .
  • determent specific person for the  testing
  • determent specific time for the  testing 
  • should have a checklist ready .

 

 

 

 

ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ

Comments (2)

profile picture

wajd said

at 2:00 am on May 18, 2008

بنات معليش كل شغلكم تحطونه بصفحة
test
لانه جداول و صعب نسويلها
copy
احنا الحين تقريبا باقيلنا كم خطوة من
test plan
بصفحة test
و مشكورين :)

profile picture

wajd said

at 4:12 am on May 23, 2008

im sorry girls i removed ur names and comment but i couldn't copy and paste and there wasn't much time
plz all leave ur names ..
sorry again ..

You don't have permission to comment on this page.